Before ordering cable for a solar system, get six things from your installer in writing: which run each cable is for, the maximum DC voltage and current, the route length, where the cable will lie, the connectors, and the specification the cable must meet.
This page is the checklist. It does not size the cable; the panel-to-inverter guide and the system-size guides do that. It makes sure the quotation you ask for describes the right cable in the right quantity.
A solar system uses different cable on different legs. Order each leg as its own line, because the cable type is different, not just the size.
| Run | Current | Kind of cable | Where to read more |
|---|---|---|---|
| Panels to inverter (strings) | DC | Single-core solar DC cable, positive and negative separate | Panel to inverter |
| Battery to inverter (hybrid) | DC, high current | Short, heavy single-core flexible cable | Inverter battery cable |
| Inverter to distribution board and meter | AC | Multi-core or single-core AC cable | Net metering cable |
| Panel frames and structure to earth | — | Earth conductor | Solar earthing cable |
House wire is not a substitute on the DC side. The DC cable vs AC cable guide explains why, and solar to grid wiring walks through every cable in the chain.
These come from the panel and inverter datasheets and the layout. Do not guess them from the system's kilowatts; two 10 kW systems can have very different string voltages and currents.
| Figure | Why it matters |
|---|---|
| Maximum string voltage (open-circuit, at the coldest expected temperature) | The cable's DC voltage rating must be at least this. Panel voltage rises as temperature falls. |
| Maximum string current, and whether strings are combined before the inverter | Sets the current the cable must carry; combined strings carry more |
| One-way route length for each run | Sets voltage drop, and therefore the size |
| Voltage-drop limit the design uses | A tighter limit needs a larger size on the same route |
| Installation: open air, conduit, tray, bunched, on a hot roof slab | Current capacity falls with heat and grouping |
A DC string needs a positive and a negative cable, so the metres of cable are about twice the measured route, plus an allowance for drops, loops and terminations that the installer should specify. Ask every supplier to quote metres of cable, state the length per coil or drum, and confirm the total. The panel-to-inverter guide covers this in detail, and price per metre, foot or coil puts two quotations on the same unit.
On a Pakistani rooftop the DC cable lives in direct sun and summer heat for its whole life. Confirm with the installer and the supplier:
Purpose-made PV cable is covered by EN 50618 and IEC 62930, which set requirements for single-core cable rated for 1.5 kV DC with resistance to sunlight and heat. Cable marketed for solar is not automatically built to either. Ask the supplier, for each line on the quotation:
| Line | What to ask |
|---|---|
| Conductor | Copper, class 5 flexible? Plain or tinned? |
| Nominal size and max resistance | Which mm², and the maximum Ω/km at 20 °C |
| DC voltage rating | Is it at least the maximum string voltage your installer gave you? |
| Insulation and sheath | Materials, maximum conductor temperature, UV resistance declared? |
| Standard | Which standard is declared, and what evidence is available for it? |
| Outer diameter | Needed to match the connectors (next section) |
Pilone's DC cable is described on the DC and solar cable range, where each size page states the rating and construction Pilone declares. Compare that with what your installer's design requires. How to read a cable datasheet explains the difference between a declaration and a test report.
Most DC connector problems are mismatches. A connector is made for a range of conductor sizes and cable outer diameters; outside that range the seal or crimp may not hold. Ask the installer:
Keep the installer's single-line diagram and string details, the cable quotation with the specification for each line, the delivery note, and any datasheet or test document the supplier provides. When the cable arrives, check it against the quotation with the delivery inspection checklist.