2.5 mm² copper — 7/.029 — three core with the earth, on its own 16 A MCB.
A dishwasher is not a motor appliance with a small heater. It is a water heater with a small motor. The element is typically 1800–2200 W, which is 8.2–10 A at 220 V, and it is on for much of a wash cycle rather than in bursts. That is more current, held for longer, than anything else on a Pakistani kitchen worktop.
For a dishwasher in Pakistan the point is 2.5 mm² copper, three core so the earth matches the live and neutral, on a dedicated 16 A MCB: the heating element draws 8.2–10 A at 220 V against the 27 A it carries clipped direct at 30 °C, leaving 11 A of margin over the breaker before derating. Read the rated current off the data plate inside the door before you buy cable, because the element is where machines differ most.
| Parameter | Value |
|---|---|
| Appliance | Dishwasher, domestic, under-counter or freestanding |
| Heating element, typical | 1800–2200 W |
| Current at 220 V | 8.2–10 A |
| Duty | Heating for much of the cycle, not in bursts |
| Breaker | 16 A MCB, its own way |
| Cable | 2.5 mm² copper (7/.029) |
| Cores | 3 core — earth bonded to the chassis |
| Capacity and margin | 27 A, so +11 A over the MCB |
| Isolation | Switched spur or socket reachable without moving the machine |
Do the sum for a normal evening with the dishwasher on the shared worktop circuit: element 2200 W = 10 A, kettle 1500 W = 6.8 A, microwave 1200 W = 5.5 A. That is 22.3 A on a 16 A MCB. The breaker goes — and it goes in the middle of a wash, which is the failure people blame on the machine. On a dedicated way, the dishwasher takes 10 A of 27 A of cable and 10 A of the breaker, and nothing plugged in elsewhere can move those numbers.
Length is not the constraint. At 10 A over a 12 m run it drops 18 × 10 × 12 ÷ 1000 = 2.16 V, inside the 5.5 V a final power circuit gets when the installation is held to 5% of 220 V — 11 V — and the submain has spent the other half. The same run in 4 mm² drops 1.32 V, which buys less than a volt — go up a size only when the run to the kitchen is long, or the same way also feeds a second heating appliance. Check your own run in the voltage drop calculator.
Take the three-core version so the earth is 2.5 mm² as well: 2.5mm 3 core flexible cable for the run behind the units, or 2.5mm single core copper (7/.029) where singles are pulled through conduit.
Class 5 flexible copper, 50/0.25 strands, PVC insulated and sheathed, drawn on the Pilone line in Lahore. Rated 27 A clipped direct at 30 °C, 18 mV/A/m on voltage drop.
Cable is priced off the day's copper rate, so we quote per metre and per coil on WhatsApp. Send the size, the metres and your city.
We draw the copper in Lahore and sell it at the day's rate — no dealer margin. Send the run length and your city: Punjab in 1–2 days, rest of Pakistan in 2–4.