How much wire does a 2 kanal house need?

PILONE CABLES TECHNICAL TEAM

About 125 coils — 60 of 1.5 mm², 53 of 2.5 mm² and 12 of 4 mm² — which is roughly 11,230 m of single-core copper, plus about 131 ft of 16 mm² four-core main cable on a three-phase connection.

That is a single-storey 2 kanal house wired to 160 points on 34 circuits, pulled through conduit, with 15% cut in for wastage. Double storey takes about 232 coils. At this size the connection is three phase and the circuits have to be balanced across it.

The 2 kanal number, in coils and in metres

A single-storey 2 kanal house of about 5,000 sq ft covered area, wired to 160 points on 34 circuits, needs roughly 11,230 m of single-core copper conductor: 5,376 m of 1.5 mm² for lights and fans, 4,733 m of 2.5 mm² for socket, kitchen and pump circuits, 1,076 m of 4 mm² for eight AC points, four geysers and the hob, and about 46 m of 6 mm² for the main earth. In 90 m coils that is 60 + 53 + 12 = 125 coils. Those figures carry a 15% wastage margin and assume conduit routing, one floor, and a main board feeding sub-boards rather than one central board.

Technical sources quote metres. Shops sell coils. One standard coil of single-core building wire is 90 m, near enough 100 yards, so the conversion at the counter is metres ÷ 90, rounded up per size.

No dedicated 2 kanal wiring list exists that we could find. Search it and you get 5 marla pages and construction-cost tables. That is a problem at this size, because a 2 kanal house is not a scaled-up 10 marla — it is a three-phase installation with a distribution design, and the quantity is the easy half.

How the 125 coils are worked out

Three inputs, multiplied. All three are visible so you can move any of them to match your own plan.

1. Count the points

160 on a single-storey 2 kanal plan: 85 light and fan points, 60 socket points, 8 AC points, 4 geysers, 1 hob, 2 pumps. Count yours off the approved layout.

2. Set the average run

22 m per point: its share of the circuit run back to a board, plus the ceiling rise and the switch drop. A 5,000 sq ft floor spans roughly 60 × 83 ft, so even with sub-boards the runs are long.

3. Count conductors per run

2.5 for lighting and fan circuits, where switch legs share neutrals; 3 for socket and appliance circuits, which each carry live, neutral and earth.

Lighting and fans: 85 × 22 × 2.5 = 4,675 m. Sockets and kitchen: 60 × 22 × 3 = 3,960 m. Two pumps on 26 m runs: 2 × 26 × 3 = 156 m, giving 4,116 m of 2.5 mm². Eight ACs, four geysers and the hob on 24 m runs: 13 × 24 × 3 = 936 m of 4 mm². Main earth: 40 m. Raw total 9,767 m. Add 15%: 9,767 × 1.15 = 11,232 m. Divide by 90 and round up per size: 125 coils.

Cross-check against the trade rule of 1.5–2 ft of conduit run per sq ft of plot. At 9,000 sq ft that is 4,120–5,490 m of runs, and at 2–3 conductors per run, 8,230–16,460 m of conductor. 11,232 m sits inside it. The method itself is on how much cable a house needs.

2 kanal house wiring cable list

Planning quantities for a single-storey 2 kanal house, 5,000 sq ft covered, 160 points, conduit wiring, 15% wastage included, three-phase connection. Coils at 90 m, rounded up per size. A planning band, not a bill.
CircuitSize (strand code)Conductor metresCoils
Lighting and fan circuits1.5 mm² (3/.029)5,376 m60
Socket, kitchen and pump circuits2.5 mm² (7/.029)4,733 m53
8 AC points, 4 geysers, hob4 mm² (7/.036)1,076 m12
Main earth conductor6 mm² (7/.044)46 mcut length
Sub-mains to 4 sub-boards16 mm² 2 core (7/.064)100 m / 328 ftcut length
Meter to main board, 3 phase16 mm² 4 core40 m / 131 ftcut length

Where the 160 points sit

A 2 kanal plot is 9,000 sq ft. After lawn, setback, porch and driveway you build about 5,000 sq ft per floor — typically six or seven bedrooms, a drawing room, a formal lounge, a family lounge, a dining room, a kitchen with a scullery, servant quarters and seven bathrooms.

A typical single-storey 2 kanal point schedule. These 160 points group into 34 circuits: 9 lighting, 8 socket, 2 kitchen, 8 AC, 4 geyser, 1 hob, 2 pump.
AreaLight and fanSocketAppliance
Master suite and dressing1082 AC
Bedrooms 2 to 522144 AC
Drawing room961 AC
Formal and family lounge16101 AC
Dining53
Kitchen, scullery, store8101 hob
7 bathrooms74 geysers
Servant quarters, garage55
Porch, lawn, boundary, stairs342 pumps
Total856015

The three-phase design a 2 kanal house needs

Eight air conditioners, four geysers and a hob will not sit on a single-phase connection. On 220 V a 25 kW sanctioned load would be 25,000 ÷ 220 = 113.6 A, which means a 35 mm² or larger service cable and a main switch to match. Split across three phases at 400 V the same load is 25,000 ÷ (400 × 1.732) = 36.1 A per phase.

That single division is what makes the service cable manageable. 16 mm² four-core copper carries 76 A with three loaded conductors and drops 36.1 × 40 × 2.8 ÷ 1000 = 4.04 V over the 40 m (131 ft) run, against a 20 V budget on 400 V. Comfortable on both counts, and a 16 mm² conductor instead of the 35 mm² the single-phase alternative would need.

Balance is the part people skip. A three-phase house is three single-phase houses sharing a neutral. Every circuit lands on one phase, and if the phases are loaded unevenly the neutral carries the difference, one phase sags under load, and the ACs on that phase run on a low voltage all summer. Thirty-four circuits across three phases is eleven or twelve each, and they have to be grouped by what runs at the same time, not by what is convenient at the board.

A balanced allocation of the 34 circuits across three phases. Grouping is by simultaneous demand: no phase carries more than three air conditioners, the geysers are spread rather than stacked, and the two kitchen circuits sit with the service phase.
PhaseLightingSocketsACHeavyCircuits
R (bedroom wing)3332 geysers11
Y (lounge and drawing)3331 geyser, hob11
B (kitchen, service, outside)3221 geyser, 2 pumps, 2 kitchen12
Total988934

Physically that becomes a three-phase main board at the meter carrying the incomer, main switch and earth bar, feeding four sub-boards: bedroom wing, lounge side, kitchen and service, and outside. Each sub-board takes a 16 mm² two-core sub-main from one phase and neutral, about 25 m each — roughly 100 m of sub-main in total, which is the row most 2 kanal estimates omit. Three-phase feeder sizing in detail is on three-phase cable size.

One consequence worth planning for: never take a socket on one phase and a light on another into the same box. Two phases in one enclosure is 400 V between terminals, and anyone who opens it later is expecting 220 V.

Single storey vs double storey

The upper floor carries about 85% of the ground floor's points — no lawn, no porch, no pumps, no servant quarters — and adds its own sub-boards on their own risers.

Same plot, same point density, one extra floor. Second-floor quantities derived as 0.85 of the ground floor plus the risers; coils rounded up per size.
ItemSingle storeyDouble storey
Points160296
1.5 mm² coils60111
2.5 mm² coils5398
4 mm² coils1223
Total coils125232
Conductor metres11,232 m20,779 m
Boards1 three-phase main + 4 sub1 three-phase main + 7 sub
16 mm² sub-mainsabout 100 mabout 190 m
Meter to main board16 mm² 4 core25 mm² 4 core on a 35 kW load

A double-storey 2 kanal at 35 kW draws 35,000 ÷ 693 = 50.5 A per phase. 16 mm² four-core carries 76 A and would still pass, but 25 mm² four-core at 96 A is the size to install once, at the start, in a house that will not be rewired for thirty years.

3/29, 7/29 and what they actually measure

Ask for 1.5 mm² at a shop in Pakistan and you will be handed 3/.029. The strand code is the trade's real vocabulary and it is imperial: 3 strands of 0.029 inch. On a 125-coil order, the difference between the code and the metric label is worth several coils of copper.

Strand code to true conductor area. Area = strands × π/4 × strand diameter², with 0.029 in = 0.7366 mm. The metric column is the size the code is sold as, not an exact equivalent.
Strand codeTrue areaSold asUsual job
3/.0291.29 mm²1.5 mm²Lights, fans
7/.0293.0 mm²2.5–3 mm²Sockets, kitchen
7/.0364.6 mm²4 mm²AC, geyser, hob
7/.0446.9 mm²6 mm²Earth
7/.0529.6 mm²10 mm²Small sub-mains
7/.06414.5 mm²16 mm²Sub-mains, service

3/.029 measures 1.29 mm², under a true 1.5 mm², so keep it on 6 A lighting circuits and off sockets. 7/.029 measures 3.0 mm², over a true 2.5 mm². How to verify a delivered coil against these numbers is set out on the 5 marla wiring page — do it on an order this size.

Current capacity, circuit by circuit

Copper conductors, PVC insulated, 450/750 V. Current capacity and voltage drop per BS 7671 (IEC 60364-5-52), installation reference method C (clipped direct), 30°C ambient; conductor resistance per IEC 60228. Four-core figures are for three loaded conductors. Wire pulled through conduit and bunched in a Lahore summer carries less — derate it. Verify sizing with a licensed electrician for your installation.
CircuitSizeCapacityVoltage dropBreaker
Lighting, fans1.5 mm²19.5 A29 mV/A/m6 A
Sockets, kitchen, pumps2.5 mm²27 A18 mV/A/m16 A
AC points, geysers, hob4 mm²36 A11 mV/A/m20–25 A
Main earth6 mm²46 A7.3 mV/A/m
Sub-main, single phase16 mm² 2 core85 A2.8 mV/A/m63 A
Meter to main board, 3 phase16 mm² 4 core76 A2.8 mV/A/m63 A

Sizing one circuit rather than a whole house? The selection chart is on single-phase cable size, and long runs are settled by the voltage drop calculator.

2 kanal wiring cost: what the number covers

Estimates for wiring one size of house differ by several times over, and the reason is scope, not the house. One figure is the wire alone; the next adds conduit, boards and accessories; the third adds the electrician. On 125 coils and four sub-boards the three scopes are very far apart.

The three scopes a 2 kanal wiring cost can mean. We quote scope A at the day's copper rate; B and C are bought elsewhere and are listed so you can read any quote correctly.
ScopeWhat is in itWho supplies it
A. Wire and cable onlyThe 125 coils, the earth conductor, the 16 mm² sub-mains, the four-core service cablePilone Cables, factory-direct
B. A plus fittingsConduit pipe, back boxes, switches, sockets, the three-phase main board, four sub-boards and all MCBs, earth electrodeElectrical store
C. B plus labourChasing walls, laying conduit, pulling wire, terminating, phase balancing, testing, making good the plasterYour electrician or contractor

Scope A is the only one we price, and we price it at the day's copper rate because copper is what moves it — on eleven kilometres of conductor, a month's drift is a serious number. Per-point and per-square-foot labour rates sit on cable installation cost. Send the coil list on WhatsApp and scope A comes back as one figure for your city.

These are planning quantities worked from a stated point count, run length and conductor count — not a certified load calculation, and not a three-phase distribution design. Current capacities assume method C at 30°C; derate for conduit, bunching and summer ambient. A three-phase installation must have its phase allocation, neutral and earthing confirmed by a licensed electrician against your approved layout. Start with the cable size calculator.

Frequently asked

2 kanal ghar ki wiring mein kitna wire lagta hai?
About 125 coils for a single storey: 60 coils of 1.5 mm² (3/.029), 53 of 2.5 mm² (7/.029) and 12 of 4 mm² (7/.036), roughly 11,230 m of conductor. Double storey takes about 232 coils. Add 46 m of 6 mm² earth wire, roughly 100 m of 16 mm² sub-mains and 131 ft of four-core service cable.
2 kanal house mein three phase zaroori hai?
In practice yes. Eight air conditioners, four geysers and a hob put the sanctioned load around 25 kW. On single phase that is 113.6 A and a 35 mm² service cable; split across three phases at 400 V it is 36.1 A per phase and 16 mm² four-core carries it comfortably. Your meter card is the authority.
Three phase mein circuits kaise balance karein?
Group by what runs at the same time, not by what is convenient at the board. Thirty-four circuits across three phases is eleven or twelve each, with no more than three air conditioners on any one phase and the geysers spread rather than stacked. An unbalanced house sags on one phase all summer.
Is the 2 kanal wiring cost only the wire, or does it include fittings and labour?
Three different scopes carry that name: wire and cable only; that plus conduit, switches, sockets and the boards; or all of it plus the electrician's labour. This page quantifies the first, which is the only one we supply. At this size the gap between the three is large enough to wreck a budget.
2 kanal mein kitne points hotay hain?
About 160 on a single storey: 85 light and fan points, 60 socket points, 8 AC points, 4 geysers, a hob and 2 pumps, across six or seven bedrooms, three reception rooms, a kitchen and scullery, seven bathrooms, servant quarters and the outside areas. Count yours off the layout.
DB box kitne way ka lena chahiye?
Do not put 34 circuits on one board. Use a three-phase main board at the meter carrying the incomer, main switch and earth bar, feeding four sub-boards: bedroom wing, lounge side, kitchen and service, and outside. Each sub-board takes a 16 mm² two-core sub-main from one phase and neutral.
One coil kitne meter ka hota hai?
A standard coil of single-core house wire in Pakistan is 90 m, close to 100 yards. Every quantity on this page converts through it: metres divided by 90, rounded up per size. Confirm the coil length in writing before ordering — across 125 coils, a few metres each is several coils of copper.
Double storey mein kitna extra wire lagega?
About 107 more coils, taking a 2 kanal from 125 to roughly 232. The upper floor carries about 85% of the ground floor's points, adds three more sub-boards and nearly doubles the sub-main length to about 190 m. Budget 25 mm² four-core for the service, because the load goes to roughly 35 kW.

The cable that feeds the house

16mm four-core standard copper cable, cut back to show four PVC-insulated stranded conductors
16MM² · 4 CORE · 450/750 V · CU CLASS 2

16mm 4 Core Standard Cable

The three-phase service run on a 2 kanal house: 7/1.70 class 2 copper, PVC insulated and sheathed, 76 A with three loaded conductors. About 131 running feet on this layout.

Factory-direct price
Contact for quote
Message us for today’s rate
Send the coil list

Prices track the daily copper rate. Send the coil list and your city for today's factory rate on the whole lot.

The rest of the list: 3/.029 single core copper cable, 7/.029 single core copper cable, 4mm single core copper cable, 16mm 2 core cable for the sub-mains, and 25mm 4 core cable for a double-storey service run.

A hundred and twenty-five coils, one factory rate

We draw the copper in Lahore and sell it at the day's rate — no dealer margin. Send the coil list and your city for today's number: Punjab in 1–2 days, rest of Pakistan in 2–4.