About 71 coils — 34 of 1.5 mm², 30 of 2.5 mm² and 7 of 4 mm² — which is roughly 6,320 m of single-core copper, plus about 105 ft of 25 mm² two-core main cable on a single-phase connection — three phase needs only 10 mm² four-core.

That is a single-storey 1 kanal house wired to 110 points on 22 circuits, pulled through conduit, with 15% cut in for wastage. Double storey takes about 131 coils. A coil is 90 m — the length the trade sells house wire in.

The 1 kanal number, in coils and in metres

A single-storey 1 kanal house of about 2,900 sq ft covered area, wired to 110 points on 22 circuits, needs roughly 6,320 m of single-core copper conductor: 3,053 m of 1.5 mm² for lights and fans, 2,684 m of 2.5 mm² for socket, kitchen and pump circuits, 552 m of 4 mm² for five AC points and three geysers, and about 35 m of 6 mm² for the main earth. In 90 m coils that is 34 + 30 + 7 = 71 coils. Those figures carry a 15% wastage margin and assume conduit routing, one floor, and boards placed to keep runs short.

Technical sources quote metres. Shops sell coils. One standard coil of single-core building wire is 90 m, near enough 100 yards, so the conversion at the counter is metres ÷ 90, rounded up per size.

At 1 kanal, quantity stops being the only question. A 4,500 sq ft plot is where one distribution board stops being enough and where the connection itself may need to change from single phase to three. Both forks are worked through below, because they change the cable list more than any coil count does.

How the 71 coils are worked out

Three inputs, multiplied. All three are on the page so you can move any of them to match your own plan.

1. Count the points

110 on a single-storey 1 kanal plan: 59 light and fan points, 42 socket points, 5 AC points, 3 geysers, 1 pump. Count yours off the approved layout.

2. Set the average run

18 m per point: its share of the circuit run back to a board, plus the ceiling rise and the switch drop. A 2,900 sq ft floor spans roughly 45 × 64 ft, which is why the runs are half again as long as on a 5 marla.

3. Count conductors per run

2.5 for lighting and fan circuits, where switch legs share neutrals; 3 for socket and appliance circuits, which each carry live, neutral and earth.

Lighting and fans: 59 × 18 × 2.5 = 2,655 m. Sockets and kitchen: 42 × 18 × 3 = 2,268 m. Pump, on a 22 m run: 1 × 22 × 3 = 66 m, giving 2,334 m of 2.5 mm². Five ACs and three geysers on 20 m runs: 8 × 20 × 3 = 480 m of 4 mm². Main earth: 30 m. Raw total 5,499 m. Add 15%: 5,499 × 1.15 = 6,324 m. Divide by 90 and round up per size: 71 coils.

Cross-check against the trade rule of 1.5–2 ft of conduit run per sq ft of plot. At 4,500 sq ft that is 2,060–2,740 m of runs, and at 2–3 conductors per run, 4,120–8,230 m of conductor. 6,324 m sits inside it. The method itself is on how much cable a house needs.

1 kanal house wiring cable list

Planning quantities for a single-storey 1 kanal house, 2,900 sq ft covered, 110 points, conduit wiring, 15% wastage included. Coils at 90 m, rounded up per size. A planning band, not a bill — count your own points off the approved layout. Single-phase connection assumed for the meter run.
CircuitSize (strand code)Conductor metresCoils
Lighting and fan circuits1.5 mm² (3/.029)3,053 m34
Socket, kitchen and pump circuits2.5 mm² (7/.029)2,684 m30
5 AC points, 3 geyser points4 mm² (7/.036)552 m7
Main earth conductor6 mm² (7/.044)35 mcut length
Sub-mains to 2 sub-boards16 mm² 2 core (7/.064)40 m / 131 ftcut length
Meter to DB main cable25 mm² 2 core32 m / 105 ftcut length

Where the 110 points sit

A 1 kanal plot is 4,500 sq ft. After setback, lawn, porch and stairs you build about 2,900 sq ft per floor — typically five bedrooms, a drawing room, a lounge, a dining room, a kitchen, a store, servant quarter and five bathrooms.

A typical single-storey 1 kanal point schedule. These 110 points group into 22 circuits: 6 lighting, 6 socket, 1 kitchen, 5 AC, 3 geyser, 1 pump.
AreaLight and fanSocketAppliance
Master bedroom and dressing861 AC
Bedrooms 2, 3 and 415103 AC
Drawing room751 AC
Lounge and dining107
Kitchen and store57
5 bathrooms53 geysers
Servant quarter and garage54
Porch, lawn, stairs, outside431 pump
Total59429

Single phase or three phase at 1 kanal

This is the fork that changes a 1 kanal cable list, and it is decided by the sanctioned load on your meter card, not by the plot size. A 1 kanal house is commonly sanctioned around 15 kW, which sits right on the line where utilities start offering three phase.

Single phase, 220 V. 15,000 ÷ 220 = 68.2 A. Over a 32 m (105 ft) run from a boundary-wall meter, 16 mm² copper carries 85 A and drops 68.2 × 32 × 2.8 ÷ 1000 = 6.11 V against an 11 V budget — it passes, but it has spent 56% of the whole house's drop allowance at the front door. 25 mm² carries 112 A and drops 3.82 V, 35% of budget. On a house this size, run the 25 mm².

Three phase, 400 V. The same 15 kW split across three phases is 15,000 ÷ (400 × 1.732) = 21.6 A per phase. That is a third of the single-phase current, so 10 mm² four-core copper — 57 A with three loaded conductors — carries it with room to spare, and drops 21.6 × 32 × 4.4 ÷ 1000 = 3.04 V against a 20 V budget on 400 V. The service cable gets much smaller; the board gets more complicated, because the house circuits then have to be split across three phases and kept roughly balanced.

The same 15 kW 1 kanal load on each connection type, over a 32 m meter run. Copper, PVC, BS 7671 method C at 30°C. Budget is 5% of the supply voltage: 11 V on 220 V single phase, 20 V on 400 V three phase.
ConnectionCurrentMain cableCapacityDrop
Single phase 220 V68.2 A16 mm² 2 core85 A6.11 V
Single phase 220 V68.2 A25 mm² 2 core112 A3.82 V
Three phase 400 V21.6 A/phase10 mm² 4 core57 A3.04 V
Three phase 400 V21.6 A/phase16 mm² 4 core76 A1.94 V

Read your meter card before you buy any of this. If it says single phase, size for 68 A and do not assume a future upgrade will reuse the cable — a three-phase conversion needs a four-core run. The sizing rationale in full is on main meter cable and three-phase cable size.

One board is not enough on 2,900 sq ft

Twenty-two circuits plus 20% spare is 27 ways. You could buy a 36-way board and run everything to it. On a 45 × 64 ft floor that is the wrong answer, because it forces every one of the 110 points to reach a single point in the building. The 18 m average run in the arithmetic above already assumes you did not do that.

The right arrangement is a main board near the meter carrying the incomer, the main switch, the earth bar and a handful of outgoing sub-mains, and then two or three sub-boards placed where the load is: one for the bedroom wing, one for the lounge, kitchen and utility side, one upstairs when the floor is built. Each sub-board is fed by a 16 mm² two-core sub-main and carries its own circuits.

Three things follow from that. Runs get shorter, so the coil count on this page holds instead of drifting up. A fault or a rewire is contained to one wing instead of taking the house down. And each sub-board gives you spare ways where you will actually need them — the bedroom wing is where the next AC goes, not the porch.

Budget one 16 mm² sub-main per sub-board, about 20 m each on this footprint. That is the row in the cable list above, and it is the item most 1 kanal wiring estimates leave out entirely.

Single storey vs double storey

Most 1 kanal houses are two floors. The upper floor carries about 85% of the ground floor's points — no lawn, no porch, no pump, no servant quarter — and takes its own board on its own riser.

Same plot, same point density, one extra floor. Second-floor quantities derived as 0.85 of the ground floor plus the riser; coils rounded up per size.
ItemSingle storeyDouble storey
Points110204
1.5 mm² coils3463
2.5 mm² coils3056
4 mm² coils712
Total coils71131
Conductor metres6,324 m11,699 m
Boards1 main + 2 sub1 main + 4 sub
16 mm² sub-mainsabout 40 mabout 85 m
Connection15 kW, either phaseThree phase, effectively

At 204 points and nine or ten air conditioners a double-storey 1 kanal has effectively decided the phase question for you. Size the service for the finished building.

3/29, 7/29 and what they actually measure

Ask for 1.5 mm² at a shop in Pakistan and you will be handed 3/.029. The strand code is the trade's real vocabulary and it is imperial: 3 strands of 0.029 inch. On a 71-coil order the difference between the code and the metric label is worth knowing.

Strand code to true conductor area. Area = strands × π/4 × strand diameter², with 0.029 in = 0.7366 mm. The metric column is the size the code is sold as, not an exact equivalent.
Strand codeTrue areaSold asUsual job
3/.0291.29 mm²1.5 mm²Lights, fans
7/.0293.0 mm²2.5–3 mm²Sockets, kitchen
7/.0364.6 mm²4 mm²AC, geyser
7/.0446.9 mm²6 mm²Earth
7/.0529.6 mm²10 mm²Three-phase service
7/.06414.5 mm²16 mm²Sub-mains

3/.029 measures 1.29 mm², under a true 1.5 mm², so keep it on 6 A lighting circuits and off sockets. 7/.029 measures 3.0 mm², over a true 2.5 mm². How to verify a delivered coil against these numbers is set out on the 5 marla wiring page — worth doing on an order this size.

Current capacity, circuit by circuit

Copper conductors, PVC insulated, 450/750 V. Current capacity and voltage drop per BS 7671 (IEC 60364-5-52), installation reference method C (clipped direct), 30°C ambient; conductor resistance per IEC 60228. Four-core figures are for three loaded conductors. Wire pulled through conduit and bunched in a Lahore summer carries less — derate it. Verify sizing with a licensed electrician for your installation.
CircuitSizeCapacityVoltage dropBreaker
Lighting, fans1.5 mm²19.5 A29 mV/A/m6 A
Sockets, kitchen, pump2.5 mm²27 A18 mV/A/m16 A
AC points, geysers4 mm²36 A11 mV/A/m20–25 A
Main earth6 mm²46 A7.3 mV/A/m
Sub-main to a sub-board16 mm²85 A2.8 mV/A/m63 A
Meter to main board25 mm²112 A1.75 mV/A/m80 A

Sizing one circuit rather than a whole house? The selection chart is on single-phase cable size, and long runs are settled by the voltage drop calculator.

1 kanal wiring cost: what the number covers

Estimates for wiring one size of house differ by several times over, and the reason is scope, not the house. One figure is the wire alone; the next adds conduit, boards and accessories; the third adds the electrician. On a 1 kanal the gap between the three is large enough to wreck a budget, so establish which you are being quoted first.

The three scopes a 1 kanal wiring cost can mean. We quote scope A at the day's copper rate; B and C are bought elsewhere and are listed so you can read any quote correctly.
ScopeWhat is in itWho supplies it
A. Wire and cable onlyThe 71 coils, the earth conductor, the 16 mm² sub-mains, the meter-to-DB main cablePilone Cables, factory-direct
B. A plus fittingsConduit pipe, back boxes, switches, sockets, the main board, the sub-boards and all MCBs, earth electrodeElectrical store
C. B plus labourChasing walls, laying conduit, pulling wire, terminating, testing, making good the plasterYour electrician or contractor

Scope A is the only one we price, and we price it at the day's copper rate because copper is what moves it — on 71 coils, a month's drift is a real number. Per-point and per-square-foot labour rates sit on cable installation cost. Send the coil list on WhatsApp and scope A comes back as one figure for your city.

These are planning quantities worked from a stated point count, run length and conductor count — not a certified load calculation. Current capacities assume method C at 30°C; derate for conduit, bunching and summer ambient. Confirm the point schedule, circuit count, board arrangement and every cable size with a licensed electrician against your approved layout, or start with the cable size calculator.

Frequently asked

1 kanal kitne coil wire lagta hai?
About 71 coils for a single storey: 34 coils of 1.5 mm² (3/.029), 30 of 2.5 mm² (7/.029) and 7 of 4 mm² (7/.036), roughly 6,320 m of conductor. Double storey takes about 131 coils. Add 35 m of 6 mm² earth wire, the 16 mm² sub-mains and about 105 ft of main cable.
1 kanal house wiring mein single phase chalega ya three phase chahiye?
Your meter card decides, not the plot. At a 15 kW sanctioned load single phase draws 68.2 A and needs 25 mm² two-core to the board; three phase splits the same load to 21.6 A per phase and needs only 10 mm² four-core. A double-storey 1 kanal with nine or ten ACs effectively settles it as three phase.
Is the 1 kanal wiring cost only the wire, or does it include fittings and labour?
Three different scopes carry that name: wire and cable only; that plus conduit, switches, sockets and the boards; or all of it plus the electrician's labour. This page quantifies the first, which is the only one we supply. On a house this size the three scopes are far apart, so ask before you compare.
1 kanal mein kitne points hotay hain?
About 110 on a single storey: 59 light and fan points, 42 socket points, 5 AC points, 3 geysers and a pump, across five bedrooms, a drawing room, a lounge and dining, a kitchen and store, five bathrooms, a servant quarter and the outside areas. Count yours off the layout.
DB box kitne way ka lena chahiye?
Twenty-two circuits plus 20% spare is 27 ways, but do not buy one 36-way board. Use a main board at the meter feeding two or three sub-boards placed where the load is, each on a 16 mm² sub-main. Shorter runs, contained faults, and spare ways where the next AC actually goes.
Meter se DB tak konsi cable jaye gi?
On a 15 kW single-phase connection, 25 mm² two-core copper over about 105 ft. 16 mm² passes at 85 A and 6.11 V, but that is 56% of the house's whole voltage-drop budget spent at the front door. On three phase the same load needs only 10 mm² four-core.
One coil kitne meter ka hota hai?
A standard coil of single-core house wire in Pakistan is 90 m, close to 100 yards. Every quantity on this page converts through it: metres divided by 90, rounded up per size. Confirm the coil length in writing before ordering — across 71 coils, a few metres each is a large quantity.
Double storey mein kitna extra wire lagega?
About 60 more coils, taking a 1 kanal from 71 to roughly 131. The upper floor carries about 85% of the ground floor's points, needs its own boards, and roughly doubles the 16 mm² sub-main length to about 85 m. Lay the riser conduit during construction, not after.

The cable that feeds the house

25mm two-core standard copper cable, cut back to show two PVC-insulated stranded conductors
25MM² · 2 CORE · 450/750 V · CU CLASS 2

25mm 2 Core Standard Cable

The meter-to-board run on a single-phase 1 kanal: 7/2.14 class 2 copper, PVC insulated and sheathed, rated 112 A on method C. About 105 running feet on this layout.

Factory-direct price
Contact for quote
Message us for today’s rate
Send the coil list

Prices track the daily copper rate. Send the coil list and your city for today's factory rate on the whole lot.

The rest of the list: 3/.029 single core copper cable, 7/.029 single core copper cable, 4mm single core copper cable, 16mm 2 core cable for the sub-mains, and 10mm 4 core cable if the connection is three phase.

Seventy-one coils and the mains, one factory rate

We draw the copper in Lahore and sell it at the day's rate — no dealer margin. Send the coil list and your city for today's number: Punjab in 1–2 days, rest of Pakistan in 2–4.